TCW00087 Horseshoe Bay Water Distribution Main Upgrade

Project Description / Overview:

The aim of this project is to upgrade the Horseshoe Bay water distribution main by installing a new DN200-DN250 Main up to the distribution tank at Horsehoe bay. This works consists of the installation of inground DN200 & DN250 DICL pipe main and the installation of DN250 Stainless Steel above ground pipework, along with associated connections to existing pipes.

Client:

TCC

Project Features:

  • Installation of DN200 & DN250 DICL pipeline buried construction.
  • Installation of DN250 Stainless steel pipeline above ground construction.
  • Steep Terrain installation
  • Difficult access to site
  • Works on Magnetic Island
  • Testing and Sterilising Mains