TRBP Inwater Works - On Shore Works

Project Description / Overview:

Additional On Shore Works for Townsville City Council:

South Townsville Stormwater Drainage
- 43m of 18x12 Precast culverts and bases
- Manhole to suit 18x12 culverts
- Outlet structure to suit 18x12 culvert
Path retaining wall
- 87m of concrete footing and retaining wall
- 227m2 of concrete path, constructed with edge protection
- 10 450mm diameter bored piers for retaining wall footing.complete with concrete apron and tide flex, constructed and tidal flows.

Goondi Creek Stormwater Outlet complete with concrete apron and tide flex.

Client:

Townsville City Council

Project Features:


    Path retaining wall
  • 87m of concrete footing and retaining wall
  • 227m2 of concrete path, constructed with edge protection
  • 10 450mm diameter bored piers for retaining wall footing.