Incitec Pivot Concrete Repairs

Project Description / Overview:

The current concrete walls of the tippler structure have cracked and are allowing water through which is leading to corrosion of reinforcing and ultimately failure of the structure.

Client:

Incitec Pivot Concrete Repairs

Project Features:


Working around train schedules
Scaffolding
Removal of 100mm of the existing wall to allow remediation of reinforcing
Reforming wall
Concrete placement