Francis Street Water Main - West End

Project Description / Overview:

Supply and construction of the Francis St
DN450 trunk water main. The works extended from an existing DN375 DICL main in Leigh St to a constructed DN375 PVC main in Henry
St. The water main is over a length of 412 m.
It included the supply and construction of the water main, valves and connection to the existing pipelines.

Client:

Townsville City Council

Project Features:


Supply and construction of a DN450 Water Main and Connection within the Suburban Streets. Included traffic management along streets and across intersections, excavation and laying of the DN450 pipework, back filling and road pavement works with asphalt surfacing. The pipeline included large concrete thrust blocks and connections to existing services requiring coordination and shutdown with the TCC. Our crews worked in with the locals and ensured good communication when working around driveway's. One resident emailed praising our staff for their professional and obliging mannerisms.