McDowells Pipeline Construction

Project Description / Overview:

Construct 1.2km of DN1300 pipeline to replace the existing redundant pipeline along Mann Road, Home Hill.

- 1.2km of DN1300 GRP Pipeline
- 29m of microtunneling under kirknie Road and Tram Line
- Upstream and downstream connections to the existing network.
- 10 Thrust Blocks
- 3 Farm Off Takes
- 4 Air Valves and 1 scour outlet
- Decommissioning of existing pipeline

Client:

North Burdekin Water Board

Project Features:


* 1.2km of DN1300 GRP Pipeline
* 29m of microtunneling under kirknie Road and Tram Line
* Upstream and downstream connections to the existing network.
* 10 Thrust Blocks
* 3 Farm Off Takes
* 4 Air Valves and 1 scour outlet
* Decommissioning of existing pipeline