AIMS - Replacement of Failed Section of Boat Ramp

Project Description / Overview:

Installation of

New section of boat ramp, due to undermining and failure of existing boat ramp. CivilPlus completed the precast works at our Laydown area and then transported the planks to site. The existing boat ramp was saw cut and sections removed until sound concrete was located. The base was then prepared
with aggregate, precast planks were placed, bolted together and then all in-fills grouted. Grouted ballast was used for the edge protection along the side of the boat ramp.

Client:

Australian Institute of Marine Science

Project Features:

  • Precast of Boat ramp planks
  • Removal of existing concrete ramp
  • Preparation of base for planks
  • Installation of new precast items
  • Installation of grouted protection
  • Concrete works adjacent to boat ramp