Kalynda Chase Valve Pit

Project Description / Overview:

Installation of

Concrete valve pit and associated pipework to provide flow metering for the Kalynda Chase bulk water supply. The works included a concrete valve pit 5.5m x 2.5m x 1.8m deep which was cast insitu prior to the pipework being installed though the blocks outs in the walls. Other works included supply and installation of DN900 flow meter at Mt Louisa, installation of 3 insertion flow meters and associated pits at Douglas Water Treatment Plant. Lowering of over flow structures and installation of level measuring devices on the sludge lagoons at DWTP.

Client:

NQ Water

Project Features:

  • Installation of 5.5m x 2.5m x1.8m concrete pit
  • Installation of all pipework including electronic flow meter
  • Fabrication and installation of steel pit covers
  • Installation of 3 insertion flow meters
  • Forming and pouring of thrust blocks
  • Completion of cut in works to existing mains with tight windows to complete works