QN WCS Concrete Works

Project Description / Overview:

The works consist of removal of existing guard rail and concrete slab, location of existing HV services, preparation of foundations and construction of 3 pad footings to accommodate two new plate and frame filters in the 367 Cobalt Plant. The project is driven by a tight time frame which is currently being met. All workmanship and materials are in accordance with the relevant Queensland Nickel standards.

Client:

Queensland Nickel

Project Features:

  • Remove the existing Armco barrier
  • Site survey and set out
  • Saw cut the existing slab to accommodate the new civil footing detail and slab extension
  • Excavations to identify any concealed services
  • Complete excavations for the civil footings and the slab extension
  • Sub grade preparations
  • Forming and reinforcing steel installations (footings, slab extension and nib wall)
  • Concrete pours (footings, slab extension and nib wall)
  • Backfilling and bitumen road sections reinstatement