Burdekin Pump Station

Project Description / Overview:

CivilPlus were engaged to construct a Pump Intake structure for the South Burdekin Water Board in the Burdekin River. This involved the construction of a sheet pile retaining wall to hold back the water & earth, the boring of 10m deep sleeved piles, a 5m high concrete structure construction, DICL/PE pipeline installation, electrical conduit installation and associated earthworks for the structure works.

Client:

Burdekin Water Board / GHD

Project Features:

  • Excavation of the river bank for access
  • Sheet piling, retaining structure (Below water 2m)
  • Bored & Sleeved Piles
  • Concrete Structure 5m high
  • DICL & PE pipe installation
  • Electrical Conduit Installation