The works consisted of demolishing and removal of existing bridge and abutments, and fabrication and installation of a steel painted bridge with connecting concrete pathways as per A.S and council standards. The bridge was constructed predominatly of 250 grade steel; the decking will be made from Enduroplank recycled plastic as per engineering specification. All workmanship and materials were in accordance with the relevant Australian Codes.