Civilplus was engaged by AMSA to demolish the existing structure, prepare the site ready to install hex tower,fabricate and installation of the Helipad.

Birthday Creek Bridge Replacement

Client: Townsville City Council

The works involve demolition and removal off-site of the existing bridge super- structure and foundations. Design and documentation of a new precast concrete bridge superstructure including precast...

Cape Bowling Green

Client: AMSA

CivilPlus were engaged to construct the removal of the existing 36m steel lattice tower and replacement with a new 16m Fiberglass GRP structure. This was a design and construct project which...

Cape Hotham Lighthouse Refurbishment

Client: Australian Maritime Safety Authority

The Cape Hotham Lighthouse located approximately 36nm to the north east of Darwin, Northern Territory, was constructed in 1928 to mark the entrance to the Clarence strait from Van Diemen Gulf. The...
The Charles Point Lighthouse situated on the Cox Peninsula, Northern Territory, was constructed in 1893 to mark the western approaches to Darwin. The lighthouse consists of a central riveted steel...

Dunk Island Jetty Refurbishment

Client: Cassowary Coast Regional Council & TMR

The jetty was wrecked in the Cyclone Yasi in February 2011, preventing Jetty access to Dunk Island, a popular tourist destination off Mission Beach. CivilPlus have been selected by QRA, CCRC &...

Green Island Groyne

Client: EPA

CivilPlus were engaged to construct a Seawall, 60m long to reduce sand migration on the island. This involved the design and installation of 13 precast piles in a very sensitive environmental...
C+ has just completed work in the NT to remove the existing structures and replace with a three module hex tower at AMSA's Stevens and Haul Round Islands.

Highway Reward Minesite - Highway Detour

Client: CASA Engineering

500m of Detour for Gregory Developmental Road around the edge of the Highway Reward Pit approximately 30km South of Charters Towers. Due to circumstances that had developed on site prior to our...
Installation of new Effluent line across the Haughton River Rail Bridge, the installation included 40 new trusses and 440m of pipe. The project encountered delays due to the work approvals from QR,...

Koombooloomba Bridge Deck

Client: Stanwell Limited Corporation

This Contract was located at Koombooloomba approx 37klm from the township of Ravenshoe in Far North Queensland. Stanwell Limited Corporation required the existing timber deck to be replaced due to...

Magnetic Island Obstruction Tower

Client: Serco Sedexo

CivilPlus were engaged to design and construct a new obstruction tower located at Mount Cook on Magnetic Island. The existing tower had been overgrown by the tree canopy and was not able to be...

Mainteck Ring Beams

Client: Mainteck

Civil & Concrete Works for conveyor drive station.
Cape Hotham projects into the Van Dieman Gulf, approximately 80 km (direct line) NE of Darwin. The structure is a steel lattice tower capped by the lantern room with a copper roof. Surfaces to be...
This Contract was located at Ollera Creek near the foot of the Paluma Range. The objective was to remediate the existing pipeline surface where rusting had occurred due to river debris impacting...

Orpheus Island Jetty Construction

Client: Orpheus Island

The aim of this project is to replace the damaged existing jetty with a new Steel Substructure with timber decking jetty on Orpheus Island. This included driven steel pile with steel headstocks and...

Paluma Dam Concrete Remediation

Client: Townsville City Council

The concrete dam inlet tower and outlet pipe has become dilapidated over time requiring remediation to stop current corrosion and further deterioration and water ingress.

Phosphate Roadworks

Client: Incitec Pivot Limited

Carry out Road Repairs at Phosphate Mine Site

Richmond Road Repairs

Client: Richmond Shire Council

Civilplus worked in conjunction with the Richmond Shire Council to complete Flood damage repairs on the Department of Main Roads owned Flinders Highway. This works consisted of catergorising...
The aim of this project is to upgrade the Horseshoe Bay water distribution main by installing a new DN200-DN250 Main up to the distribution tank at Horsehoe bay. This works consists of the...
The aim of this project is to restore the Picnic Bay jetty to a condition to allow the public access to the jetty. This involves timber girder strengthening and replacement, concrete & timber...

Tondara Road Upgrade

Client: Evolution Mining

Carry out works to upgrade earthworks and roads at the Evolution Mine Site
Copyright © 2019 CivilPlus Constructions Pty. Ltd. All Rights Reserved.