The Tablelands Regional Council has engaged CivilPlus Constructions for the Yungaburra Raw Water Intake Replacement project. This project involves replacing the existing pipeline infrastructure...
Port of Townsville Limited (POTL) engaged CivilPlus Constructions to inspect and repair an underground fuel pipeline at Point 13. This diesel fuel oil line extends from the ATOM Terminal to Berths...
CivilPlus Constructions, in collaboration with McBerns Innovation Solutions, successfully completed the installation of bespoke ventilation poles at Pump Station BU7 in Burdell, Townsville, for the...
Townsville City Council has engaged CivilPlus Constructions to construct a 9.5km pipeline from Ross River Dam to the Douglas Water Treatment Plant. The purpose of this project is to duplicate the...
CivilPlus Constructions has been engaged by Townsville City Council to undertake the Stagpole Street DN225 Water Main Replacement. This project was initiated by Council as part of their commitment...
Townsville City Council have engaged the services of CivilPlus Constructions for the replacement of Giru Raw Water Pumps.
The scope of works includes the replacement of raw water pumps,...
As part of the upgrade to the Townsville water system, CivilPlus have been engaged to design and construct a new main waterline underneath the Ross River. The new waterline will connect the...
The Douglas Water Treatment Plant Outlet Pipe Interconnection project involved the addition of a new pipeline connecting the Douglas lines and Mt Louisa lines directly after the pump stations. This...
Cleveland Bay Purification Plant experienced a loss in integrity of a DN750 DICL wastewater pipeline between the secondary screens and the flow distributor as a result of the Townsville 2019...
QBuild have engaged the services of CivilPlus Constructions to upgrade the Forts Junction on Magnetic Island including a car park, amenities building and new bus stops and full road...
Townsville City Council has engaged the services of CivilPlus Constructions to construct a portion of their Haughton Pipeline Duplication Project (Stage 1). This project aims to provide improve...
Installation of Dual saltwater intake pipelines, off shore from the AIMS Cape Ferguson Facility approximately 50km South of Townsville. The project is located in a marine park area and all works...
The project required the installation of approx 100mtrs of 700 series Humes jacking pipes under the heritage and sacred site of ANZAC Park the Strand. Upon commencement of the tunneling and jacking...
Berth 4 Upgrade The Port of Townsville is a vital trading port for North Queensland and is Northern Australia's largest general cargo and container port. Berth 4 was previously used mainly for...
Installation of 1.3km of DN500 HDPE pipe in tidal areas, this included the welding of all pipe, pressure testing, management of ASS & PASS. Anchor blocks were cast to allow the pipe to be...
CivilPlus were engaged to construct a Pump Intake structure for the South Burdekin Water Board in the Burdekin River. This involved the construction of a sheet pile retaining wall to hold back the...
In order to maintain reliable water supply to the top of Castle Hill, the existing old and deteriorated water main has been proposed to be replaced with a new DN50 stainless steel water main.
The...
Monadelphous Engineering was awarded the project to upgrade the Cleveland Bay Purification Plant by TCC and has engaged the services of C+ to supply precast items and installation of 500m of...
CivilPlus were engaged to construct a replacement section of the 1050dia Water main under the Douglas Arterial Road for the Duplication Works. This involved the installation of a 1200dia enveloper...
Supply and construction of the Francis St DN450 trunk water main. The works extended from an existing DN375 DICL main in Leigh St to a constructed DN375 PVC main in Henry St. The water main is over...
Installation of new Effluent line across the Haughton River Rail Bridge, the installation included 40 new trusses and 440m of pipe. The project encountered delays due to the work approvals from QR,...
CivilPlus were engaged to install the various pipelines required for the new Water Treatment Facility which would upgrade supply to Townsville and surrounding suburbs. The 30 pipelines consisted of...
Installation of 1.5km of 550mm HDPE Pipe installed through the Mangroves, Mudflat and Reef flat. This involved working in sensitive marine areas to remove mangroves and treat ASS soils to minimise...
Construct 1.2km of DN1300 pipeline to replace the existing redundant pipeline along Mann Road, Home Hill.
1.2km of DN1300 GRP Pipeline
29m of microtunneling under kirknie Road and Tram Line...
Pipe Welding Subcontract
CivilPlus (previously CivMEC) Constructions were initially subcontracted to complete the internal and external welds of the 800mm diameter MSCL Pipeline. However our scope...
Completion of 14 Lot sub division including sealed access roads, water reticulation, bulk earthworks and drainage works. Worked with client to overcome problems which arose with clashes of...
The aim of this project is to provide temporary new facilities to house the relocation of two close health companies. CivilPlus is completing the pre-works and services that includes drainage, bulk...
This Contract was located at Ollera Creek near the foot of the Paluma Range. The objective was to remediate the existing pipeline surface where rusting had occurred due to river debris impacting...
Project Description / Overview:Installation of removal and replacement of sections of pipes ranging in size from 445mm to 660mm in areas with extremely difficult access and in the World Tropics...
POTL required a new RCBC (2.4 x 1.5mtrs) drainage system to reduce flood zones and to allow future expansion sites to be available & suitable for construction as approved.
Installation of repairs to QN fuel oil line at approximately 37 locations between the Port of Townsville and QN Yabulu Refinery. This scope of works included the excavation of the sections of pipe,...
Civilplus have been contracted to install 240m of 1500 span concrete inverted culvert to the perimeter of the main warehouse facility at Queensland Nickel. This is to provide drainage to the...
Demolition at three fuel hydrant locations, Concrete slab (nil reinforcing) 1.5m wide x 10m long x 0.4 - 0.5m deep, Including concrete at hydrant and high point surrounds, Low point drains...
CivilPlus were engaged to construct a 180,000L Spelceptor tank at the RAAF Base fuel farm, this included precast items for the fire trap and anchor blocks. The 4m deep excavation was sheet piled to...
Supply and installation 2km DN630PE, DN500DICL, DN450DICL and DN375DICL water main. Also included installation DN750RCP enveloper pipe with some of this being bored and jacked under Stuart Drive /...
The aim of this project is to upgrade the Horseshoe Bay water distribution main by installing a new DN200-DN250 Main up to the distribution tank at Horsehoe bay. This works consists of the...
The TPIX Inner Harbour Project requires CivilPlus Constructions to install the utilities services to wharf 10A as part of the harbour expansion. The services include Fire, Potable Water, Diesel and...
Installation of Valve pit, flow metering slab and interconnecting pipework. The valve pit consisted of a 5m x 3m x 3m deep valve pit for the connection to the underground DN600m main which was...
Installation of 200m of DN600 DICL fully flanged pipe with associated thrust blocks and 150m of DN200 RRJ pipe. The DN600mm main included a component of Tunnel Boring installation of an enveloper...
Installation of new 800mm MSCL pipe line to allow for the new highway intersection to be installed. The works included large inground valve pits at each end of the line, large inground thrust...