Cleveland Bay Purification Plant experienced a loss in integrity of a DN750 DICL wastewater pipeline between the secondary screens and the flow distributor as a result of the Townsville 2019 Floods.
CivilPlus has been engaged to make redundant the existing pipeline and construct a new pipeline in its place.