Marine Services

Eastern Breakwater Shortening

Client: Port of Townsville

Port of Townsville has engaged CivilPlus Constructions for the shortening of the eastern breakwater at the Townsville Port. This project involves the reduction of the current length of the Eastern...

Wilmar Cane Rail Bridge Repair

Client: Wilmar Sugar

The Haughton River Cane Railway Bridge is a vital part of the Invicta railway network.  They bridge connects the mill on the northern bank of the Haughton River to the majority of the cane...

Albino Rock Helipad & Walkway

Client: Australian Maritime Safety Authority (AMSA)

The Albino Rock AtoN lies within the Great Barrier Reef Marine Park (GBRMP). It is located off the coast of Ingham, near Palm Island, North Queensland, and has an elevation of 26m and is...

Burdekin Amphibious Weed Removal

Client: NQ Dry Tropics

NQ Dry Tropics has engaged the help of CivilPlus Constructions to undertake amphibious excavator works in the Burdekin region. The works include the removal of invasive plants from the waterways to...

Slade Point Boat Ramp - Seagull Street

Client: Mackay Regional Council

CivilPlus Constructions has been engaged by Mackay Regional Council to construct the Seagull Street Boat Ramp at Slade Point, North Mackay. The new boat ramp will reduce the congestion at other...
The Hammond Rock aid to navigation (AtoN) is located in the Prince of Wales Channel, Torres Strait. The Hammond Rock site is used to support a Category 1 marine AtoN which marks both the rock and...
TMR have enlisted the services of CivilPlus to relocate the Mt Spec Watermain to enable preliminary works for the Bruce Highway – Townsville Northern Access Intersections Upgrade. The Mt Spec...
The Cairncross Islets and Hannibal Island Aids to Navigation (AtoN) are located approximately 40nm and 60nm respectively south east of the tip Cape York, QLD. The existing structure at Cairncross...

Clare Weir Rail Replacement

Client: SunWater Limited

Clare Weir is situated outside of Burdekin Falls Dam and is the most critical piece of infrastructure attached to the Burdekin Haughton Water Supply Scheme (BHWSS). It provides the pumping pool for...
Department of Transport and Main Roads have engaged the services of CivilPlus Constructions to reconstruct the Ross Creek Boat Ramps. Located at the Coast Guard Ramps on Sir Leslie Thiess Drive in...

AIMS - Replacement of Failed Section of Boat Ramp

Client: Australian Institute of Marine Science

Installation of new section of boat ramp, due to undermining and failure of existing boat ramp. CivilPlus completed the precast works at our Laydown area and then transported the planks to site....

Barnicle Street Boat Ramp

Client: TCC on behalf of Transport & Main Roads

Queensland Department of Transport and Main Roads (TMR) have identified that Townsville is short of recreational boating launching and retrieval facilities for all-tide access. TMR had...

Berth 4 Upgrade

Client: Port Of Townsville

Berth 4 Upgrade The Port of Townsville is a vital trading port for North Queensland and is Northern Australia's largest general cargo and container port. Berth 4 was previously used mainly for...

Burketown Wharf 3 Lane Barge Ramp

Client: Burke Shire Council

Burke Shire Council has contracted CivilPlus to remove the existing boat ramp and install a new 3 lane wide road ramp and hardstand.

Cape Bowling Green

Client: AMSA

CivilPlus were engaged to construct the removal of the existing 36m steel lattice tower and replacement with a new 16m Fiberglass GRP structure. This was a design and construct project which...

Clump Point Jetty Refurbishment

Client: Cassowary Coast Regional Council

The jetty was wrecked in the Cyclone Yasi in February 2011, preventing tourism and fishing access from the Clump Point Jetty. CivilPlus was awarded the project by QRA, CCRC & TMR to design and...

Dunk Island Jetty Refurbishment

Client: Cassowary Coast Regional Council & TMR

The jetty was wrecked in the Cyclone Yasi in February 2011, preventing Jetty access to Dunk Island, a popular tourist destination off Mission Beach. CivilPlus have been selected by QRA, CCRC &...

Green Island Groyne

Client: EPA

CivilPlus were engaged to construct a Seawall, 60m long to reduce sand migration on the island. This involved the design and installation of 13 precast piles in a very sensitive environmental...

Lucinda Piling Works

Client: Port of Townsville

This project required the replacement of damaged landward mooring piles, delivery and installation new timber dolphins, remove selected fender piles from inshore services, dispose adjacent inshore...

Magnetic Island Obstruction Tower

Client: Serco Sedexo

CivilPlus were engaged to design and construct a new obstruction tower located at Mount Cook on Magnetic Island. The existing tower had been overgrown by the tree canopy and was not able to be...

Magnetic Island Water Supply Pipeline

Client: Pacific Marine Group

Installation of 1.5km of 550mm HDPE Pipe installed through the Mangroves, Mudflat and Reef flat. This involved working in sensitive marine areas to remove mangroves and treat ASS soils to minimise...

Mornington Island Jetty Demolition

Client: Mornington Shire Council

Removal and Replacement of Piles on Jetty

Orpheus Island Jetty Construction

Client: Orpheus Island

The aim of this project is to replace the damaged existing jetty with a new Steel Substructure with timber decking jetty on Orpheus Island. This included driven steel pile with steel headstocks and...

Pre Cast Planks

Client: Pacific Marine Group

Constructions of Pre Cast Concrete Planks for Abbott Point Barge Landing Facility

Proserpine Boat Ramp

Client: Department of Transport & Main Roads

The Proserpine Boat ramp required upgrading to provide safer and increased access by the community. The major items included in the Works are: Design of the floating walkway (including construction...
Installation of Civil Works for Palm Island Jetty & Barge Ramp Upgrade, which included placement of select fill, placement of armour rock, Precast & Cast insitu items for the Barge ramp...

Ross Island Dredging

Client: Serco Sedexo Defence Services

This project was completed at the 10FSB amphibious landing craft facility at Ross Island Townsville. CivilPlus were engaged to dredge 3500m3 of spoil from the marina basin to ensure the ADF site...

Ross Island Dredging

Client: Aurecon

Dredging of Ross Island for Department of Defence
The pontoons at 10FSB Townsville required the isolation and disconnection of all services prior to extraction from the marina berth. The pontoons were removed using a mobile gantry crane and loaded...
The aim of this project is to restore the Picnic Bay jetty to a condition to allow the public access to the jetty. This involves timber girder strengthening and replacement, concrete & timber...

Townsville Port Inner Harbour Expansion

Client: Seymour Whyte Smithbridge Joint Venture

The TPIX Inner Harbour Project requires CivilPlus Constructions to install the utilities services to wharf 10A as part of the harbour expansion. The services include Fire, Potable Water, Diesel and...

TRBP Inwater Works

Client: Townsville City Council

The Townsville Recreational Boating Park TRBP) will consist of four boat ramps each with four lanes and centre floating walkway. The project will also include an adequate number of car trailer...
Project Works included the removal of the existing DN200 water line which ran from the floating pump station in the dam to the treatment plant on the bank, which was a total distance of 550m. Once...