Project Works included the removal of the existing DN200 water line which ran from the floating pump station in the dam to the treatment plant on the bank, which was a total distance of 550m. Once line removed all electrical cables and old anchors removed from line, line pressure tested to confirm integrity. New 90mm HDPE line supplied to house electrical cables, stainless steel clamps installed around both lines and stainless steel anchor chain attached. Line reinstalled into dam and submerged, electrical works then carried out to reconnect power to pumps.