Tully Road Repairs

Project Overview / Description

CivilPlus were engaged by Serco Sodexo to complete remediation works on the Australian Defence Force Tully Training Area Access Roads. These works included construction of a 50mtr retaining wall, rock gabion protection structures, gabion grouting and foam bitumen placement.

Project Features:

    • Retaining Wall Structure
    • Gabion Installation
    • Rock Grouting
    • Geo Fabric Placement
    • Subgrade Preparation
    • Foam Bitumen Surfacing
    • World Heritage Listed Environment
    • Erosion Sediment Control
    • Plant Hygiene

Project Gallery Images