Constructions of TRBP Stage 2 Storm Water. Installation of 1500RCP & 1800RCP with associated stormwater manholes, Kerb inlet pits and Outlet structure in tidal water.
Project Features:
Installation of 1500RCP Pipes.
Installation of 1800RCP Pipes at over 3m depth in water charged ground.
Installation of Pits both *Cast Insitu and Precast on site.
Installation of an Outlet structure in tidal water.