Installation of 200m of DN600 DICL fully flanged pipe with associated thrust blocks and 150m of DN200 RRJ pipe. The DN600mm main included a component of Tunnel Boring installation of an enveloper and then installing the pipe into the enveloper.
Due to issues encountered on the project a detour of the Bruce Highway had to be constructed in short time to allow works to continue for the trunk main installation. Works also included a tunnel bore underneath the Main Northern QR line at a depth of approximately 3m.