The current concrete walls of the tippler structure have cracked and are allowing water through which is leading to corrosion of reinforcing and ultimately failure of the structure
Project Features:
Working around train schedules
Scaffolding
Removal of 100mm of the existing wall to allow remediation of reinforcing