Installation of reinforced concrete footing to support the oil furnace stack, the footing was supported by driven precast piles. The works including two small stormwater pits, nib walls and small amount of piping to ensure that all stormwater was captured and diverted to the oil water separator. A Lighting protection
system was also installed in the foundation for future connection to the stack if required.