Project Overview / Description

CivilPlus were engaged to construct a Pump Intake structure for the South Burdekin Water Board in the Burdekin River. This involved the construction of a sheet pile retaining wall to hold back the water & earth, the boring of 10m deep sleeved piles, a 5m high concrete structure, DICL/PE pipeline installation, electrical conduit installation and associated earthworks for the structure works.

Project Features:

    • Excavation of the river bank for access
    • Sheet piling, retaining structure (Below water 2m)
    • Bored & Sleeved Piles
    • Concrete Structure 5m high
    • DICL & PE pipe installation
    • Electrical Conduit Installation