Ravenswood Sediment Dam

Project Overview / Description

Carpentaria Gold have engaged C+ Services to construct a sediment dam on the Ravenswood Mine Site. The purpose of the works is to capture runoff from the adjacent waste rock dumps prior to runoff entering Sandy Creek Downstream.

Project Features:

    • Avoiding cultural heritage and environmentally sensitive areas.
    • Excavation of Dirty Water Drains including removal and spoiling of unsuitable or excess material.
    • Excavation of spillway channel and spillway road crossing/access ramp including removal and spoiling of unsuitable or excess material.
    • Supply & install of erosion protection works including rock lined channels and spillway erosion protection.
    • Construction of new spillway from the dam including a concrete sil.
    • Sourcing suitable fill materials which conform to the requirements of the specification.
    • Hydro mulch and topsoiling the works to establish vegetation cover.

Project Gallery Images