Francis Street Water Main - West End

Project Overview / Description

Supply and construction of the Francis St DN450 trunk water main. The works extended from an existing DN375 DICL main in Leigh St to a constructed DN375 PVC main in Henry St. The water main is over a length of 412 m.  It included the supply and construction of the water main, valves and connection to the existing pipelines.

Project Features:

    • Supply and construction of a DN450 Water Main and Connection within the Suburban Streets.
    • Included traffic management along streets and across intersections, excavation and laying of the DN450 pipework, back filling and road pavement works with asphalt surfacing.
    • The pipeline included large concrete thrust blocks and connections to existing services requiring coordination and shutdown with the TCC.
    • Our crews worked in with the locals and ensured good communication when working around driveway's.
    • One resident emailed praising our staff for their professional and obliging mannerisms.