Queensland Rail engaged CivilPlus Constructions to address a failed rail track drainage system under the road at Brandon, which had caused subsidence and cracking in the road surface. If left unaddressed, the damage posed a risk of road failure. CivilPlus was contracted to carry out the necessary repairs to prevent further deterioration.