BHP Port Hardstand

Project Overview / Description

A concrete pavement required for BHP to store containers at Berth 2, Townsville Port, these containers arrive from Western Australia on ship to then be transported to BHP Nickel Refinery. The works included the removal of existing materials to the required profiles, compaction of sub-grade, placement of gravel sub-base and bitumen sealing of the surface. Once the base was completed the concrete formwork & reinforcing was installed and the concrete poured in sections as required utilizing a concrete laser screed for placement.

Project Features:

    • Surveying of site construction
    • Demolition and earthworks of materials
    • Relocation of unknown site services
    • Traffic management and control
    • Sub-grade pavement
    • Gravel pavements
    • Bitumen Surfacing
    • Specified concrete works, steel reinforcements, joints, sealants and surface requirements
    • Concrete pours during night works
    • Removal & Installation of fence compound

Project Gallery Images