|
The Lucinda Bulk Sugar Terminal (LBST) jetty tail end underwent a staged structural refurbishment to address deterioration of the existing prestressed concrete deck and associated marine infrastructure. The works involved a combination of full deck replacement, in-situ concrete for new headstocks, new fire main installations, bridge railings, asphalt surfacing, and structural strengthening to extend the service life of the asset while maintaining operational functionality.
The works were undertaken within a live operational marine environment with strict load and access constraints, requiring detailed planning, temporary works with RPEQ sign-off, and staged construction methodologies to ensure safety, continuity of bulk sugar operations, and compliance with design requirements.
|