Tully Falls Weir is located on the Tully River and situated within the Wet Tropics World Heritage Area. CivilPlus is engaged to upgrade the Kareeya Power Station Tully River Intake/Weir Bridge. These works include manufacture, supply, and installation of precast concrete bridge superstructure, modification of existing bridge support Piers and Abutments, re-profiling the existing bridge approaches and guardrail modifications and install new concrete decking on causeway between the bridge sections