McDowells Pipeline Construction

Project Overview / Description

Construct 1.2km of DN1300 pipeline to replace the existing redundant pipeline along Mann Road, Home Hill.

  • 1.2km of DN1300 GRP Pipeline
  • 29m of microtunneling under kirknie Road and Tram Line
  • Upstream and downstream connections to the existing network.
  • 10 Thrust Blocks
  • 3 Farm Off Takes
  • 4 Air Valves and 1 scour outlet
  • Decommissioning of existing pipeline

Project Features:

    • 1.2km of DN1300 GRP Pipeline
    • 29m of microtunneling under kirknie Road and Tram Line
    • Upstream and downstream connections to the existing network.
    • 10 Thrust Blocks
    • 3 Farm Off Takes
    • 4 Air Valves and 1 scour outlet
    • Decommissioning of existing pipeline