NQ1648 MIRR/3122 The Upgrade of the Mt Isa ARES depot pavement and hardstand areas. This included upgrading of the parade and parking bays for the depot, along with concrete light vehicle hardstand.
Project Features:
Excavation of existing areas and establishment of levels to ensure runoff
The heavy vehicle pavement was constructed with gravel Pavement and cement treated pavements and finished with a Bitumen Seal
The heavy vehicle area included concrete hardstand areas and concrete drainage.
The light vehicle concrete area was constructed between the light vehicle storage sheds and required tie-in of levels driveway to the street.