Tully Falls Weir is located on the Tully River and situated within the Wet Tropics World Heritage Area.  CivilPlus is engaged to upgrade the Kareeya Power Station Tully River Intake/Weir Bridge.  These works include manufacture, supply, and installation of precast concrete bridge superstructure, modification of existing bridge support Piers and Abutments, re-profiling the existing bridge approaches and guardrail modifications and install new concrete decking on causeway between the bridge sections

Project Features:

    • Engage Design and Supply of the Humedeck System and modifications to the Sub Structure
    • Design, Supply and Install a Purpose built Gantry Crane for the removal and Installation of the bridge
    • Demolition of the existing bridge
    • Saw cutting back the existing Piers and Abutments
    • Construct modified support on the existing piers
    • Install Humedeck units on the bridge
    • Concrete Causeway slab between the two bridge sections
    • Approach slabs and guardrail