The nature of works requires
Compliance with Quality, WHS and Environmental legislation
Supply and install steel liners
Excavate piles
Supply and install reinforced cages and concrete...
This Contract was at Speed Creek located within the Australian Defence Force TFTA site. Previous construction had not been adequate to stop undermining of the existing abutment and CivilPlus were...
Constructions of TRBP Stage 2 Storm Water. Installation of 1500RCP & 1800RCP with associated stormwater manholes, Kerb inlet pits and Outlet structure in tidal water.
Supply and installation 2km DN630PE, DN500DICL, DN450DICL and DN375DICL water main. Also included installation DN750RCP enveloper pipe with some of this being bored and jacked under Stuart Drive /...
CivilPlus were engaged to construct a Wash down Facility at the TCC Bamford Lane depot to facilitate the wash down of the garbage trucks after each shift. This included the installation of a...
The aim of this project is to construct a new booster pump station to pump water to Kulburn reservoir and northern areas of Townsville. The works involves a Pump House building construction to...
The aim of this project is to upgrade the Horseshoe Bay water distribution main by installing a new DN200-DN250 Main up to the distribution tank at Horsehoe bay. This works consists of the...
Road construction works including site hardening, installation of drainage and erosion prevention works, roads and tracks inc any required use of quarry resources, mechanical stabilisation of...
The Project Consisted of Road Maintenance Grading and formation, Concrete creek crossing consisting of Stabilised Gravel Base, Concrete Causeway and stabilised approaches as well as Stabilised...
The aim of this project is to restore the Picnic Bay jetty to a condition to allow the public access to the jetty. This involves timber girder strengthening and replacement, concrete & timber...
Road Construction works including site hardening, installation of drainage and erosion prevention works maintenance of access roads & tracks inc any required use of quarry resources, mechanical...
CivilPlus were required to complete multiple sheet pile driven retaining walls for the Townsville Hospital elevator shafts for the expansion of the emergency facility at Douglas. This was a design...
The TPIX Inner Harbour Project requires CivilPlus Constructions to install the utilities services to wharf 10A as part of the harbour expansion. The services include Fire, Potable Water, Diesel and...
The Townsville Recreational Boating Park TRBP) will consist of four boat ramps each with four lanes and centre floating walkway. The project will also include an adequate number of car trailer...
Additional On Shore Works for Townsville City Council:
South Townsville Stormwater Drainage
43m of 18x12 Precast culverts and bases
Manhole to suit 18x12 culverts
Outlet structure to suit...
CivilPlus were engaged by Serco Sodexo to complete remediation works on the Australian Defence Force Tully Training Area Access Roads. These works included construction of a 50mtr retaining wall,...
Design and install a feed mill to process 350tonne of livestock feed per week. This consisted of assisting with concept design, approving layouts and then managing the designers though to...
Completion of various pavement repairs and hardstands at MSTA, Many Peaks, Runway Investigation and Lavarack Parade Grounds. Works included removal and replace of pavement, installation of new...
CivilPlus were engaged by Serco Sodexo to complete remediation works at the high range training facility. These works included excavation of existing road and subgrade, placement of geo grid and...
Installation of Valve pit, flow metering slab and interconnecting pipework. The valve pit consisted of a 5m x 3m x 3m deep valve pit for the connection to the underground DN600m main which was...
Installation of 200m of DN600 DICL fully flanged pipe with associated thrust blocks and 150m of DN200 RRJ pipe. The DN600mm main included a component of Tunnel Boring installation of an enveloper...
Installation of new 800mm MSCL pipe line to allow for the new highway intersection to be installed. The works included large inground valve pits at each end of the line, large inground thrust...
Project Works included the removal of the existing DN200 water line which ran from the floating pump station in the dam to the treatment plant on the bank, which was a total distance of 550m. Once...